summaryrefslogtreecommitdiffstats
path: root/Documentation/scheduler/sched-design.txt
blob: 1605bf0cba8bd5da6b9f81502e7256094056d9bb (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
		   Goals, Design and Implementation of the
		      new ultra-scalable O(1) scheduler


  This is an edited version of an email Ingo Molnar sent to
  lkml on 4 Jan 2002.  It describes the goals, design, and
  implementation of Ingo's new ultra-scalable O(1) scheduler.
  Last Updated: 18 April 2002.


Goal
====

The main goal of the new scheduler is to keep all the good things we know
and love about the current Linux scheduler:

 - good interactive performance even during high load: if the user
   types or clicks then the system must react instantly and must execute
   the user tasks smoothly, even during considerable background load.

 - good scheduling/wakeup performance with 1-2 runnable processes.

 - fairness: no process should stay without any timeslice for any
   unreasonable amount of time. No process should get an unjustly high
   amount of CPU time.

 - priorities: less important tasks can be started with lower priority,
   more important tasks with higher priority.

 - SMP efficiency: no CPU should stay idle if there is work to do.

 - SMP affinity: processes which run on one CPU should stay affine to
   that CPU. Processes should not bounce between CPUs too frequently.

 - plus additional scheduler features: RT scheduling, CPU binding.

and the goal is also to add a few new things:

 - fully O(1) scheduling. Are you tired of the recalculation loop
   blowing the L1 cache away every now and then? Do you think the goodness
   loop is taking a bit too long to finish if there are lots of runnable
   processes? This new scheduler takes no prisoners: wakeup(), schedule(),
   the timer interrupt are all O(1) algorithms. There is no recalculation
   loop. There is no goodness loop either.

 - 'perfect' SMP scalability. With the new scheduler there is no 'big'
   runqueue_lock anymore - it's all per-CPU runqueues and locks - two
   tasks on two separate CPUs can wake up, schedule and context-switch
   completely in parallel, without any interlocking. All
   scheduling-relevant data is structured for maximum scalability.

 - better SMP affinity. The old scheduler has a particular weakness that
   causes the random bouncing of tasks between CPUs if/when higher
   priority/interactive tasks, this was observed and reported by many
   people. The reason is that the timeslice recalculation loop first needs
   every currently running task to consume its timeslice. But when this
   happens on eg. an 8-way system, then this property starves an
   increasing number of CPUs from executing any process. Once the last
   task that has a timeslice left has finished using up that timeslice,
   the recalculation loop is triggered and other CPUs can start executing
   tasks again - after having idled around for a number of timer ticks.
   The more CPUs, the worse this effect.

   Furthermore, this same effect causes the bouncing effect as well:
   whenever there is such a 'timeslice squeeze' of the global runqueue,
   idle processors start executing tasks which are not affine to that CPU.
   (because the affine tasks have finished off their timeslices already.)

   The new scheduler solves this problem by distributing timeslices on a
   per-CPU basis, without having any global synchronization or
   recalculation.

 - batch scheduling. A significant proportion of computing-intensive tasks
   benefit from batch-scheduling, where timeslices are long and processes
   are roundrobin scheduled. The new scheduler does such batch-scheduling
   of the lowest priority tasks - so nice +19 jobs will get
   'batch-scheduled' automatically. With this scheduler, nice +19 jobs are
   in essence SCHED_IDLE, from an interactiveness point of view.

 - handle extreme loads more smoothly, without breakdown and scheduling
   storms.

 - O(1) RT scheduling. For those RT folks who are paranoid about the
   O(nr_running) property of the goodness loop and the recalculation loop.

 - run fork()ed children before the parent. Andrea has pointed out the
   advantages of this a few months ago, but patches for this feature
   do not work with the old scheduler as well as they should,
   because idle processes often steal the new child before the fork()ing
   CPU gets to execute it.


Design
======

The core of the new scheduler contains the following mechanisms:

 - *two* priority-ordered 'priority arrays' per CPU. There is an 'active'
   array and an 'expired' array. The active array contains all tasks that
   are affine to this CPU and have timeslices left. The expired array
   contains all tasks which have used up their timeslices - but this array
   is kept sorted as well. The active and expired array is not accessed
   directly, it's accessed through two pointers in the per-CPU runqueue
   structure. If all active tasks are used up then we 'switch' the two
   pointers and from now on the ready-to-go (former-) expired array is the
   active array - and the empty active array serves as the new collector
   for expired tasks.

 - there is a 64-bit bitmap cache for array indices. Finding the highest
   priority task is thus a matter of two x86 BSFL bit-search instructions.

the split-array solution enables us to have an arbitrary number of active
and expired tasks, and the recalculation of timeslices can be done
immediately when the timeslice expires. Because the arrays are always
access through the pointers in the runqueue, switching the two arrays can
be done very quickly.

this is a hybride priority-list approach coupled with roundrobin
scheduling and the array-switch method of distributing timeslices.

 - there is a per-task 'load estimator'.

one of the toughest things to get right is good interactive feel during
heavy system load. While playing with various scheduler variants i found
that the best interactive feel is achieved not by 'boosting' interactive
tasks, but by 'punishing' tasks that want to use more CPU time than there
is available. This method is also much easier to do in an O(1) fashion.

to establish the actual 'load' the task contributes to the system, a
complex-looking but pretty accurate method is used: there is a 4-entry
'history' ringbuffer of the task's activities during the last 4 seconds.
This ringbuffer is operated without much overhead. The entries tell the
scheduler a pretty accurate load-history of the task: has it used up more
CPU time or less during the past N seconds. [the size '4' and the interval
of 4x 1 seconds was found by lots of experimentation - this part is
flexible and can be changed in both directions.]

the penalty a task gets for generating more load than the CPU can handle
is a priority decrease - there is a maximum amount to this penalty
relative to their static priority, so even fully CPU-bound tasks will
observe each other's priorities, and will share the CPU accordingly.

the SMP load-balancer can be extended/switched with additional parallel
computing and cache hierarchy concepts: NUMA scheduling, multi-core CPUs
can be supported easily by changing the load-balancer. Right now it's
tuned for my SMP systems.

i skipped the prev->mm == next->mm advantage - no workload i know of shows
any sensitivity to this. It can be added back by sacrificing O(1)
schedule() [the current and one-lower priority list can be searched for a
that->mm == current->mm condition], but costs a fair number of cycles
during a number of important workloads, so i wanted to avoid this as much
as possible.

- the SMP idle-task startup code was still racy and the new scheduler
triggered this. So i streamlined the idle-setup code a bit. We do not call
into schedule() before all processors have started up fully and all idle
threads are in place.

- the patch also cleans up a number of aspects of sched.c - moves code
into other areas of the kernel where it's appropriate, and simplifies
certain code paths and data constructs. As a result, the new scheduler's
code is smaller than the old one.

	Ingo